General Line Extension Policy
- Service applications expire after 90 days. If metering point is not ready within 90 days of application, the request and work order will be automatically voided and subject to a subsequent staking fee.
- Cooperative provided the first 2 hours of Right-of-Way (ROW) trimming for free. Additional hours will be charged at a rate of $225.00 per hour.
- After-hours and weekend construction are available provided member agrees to pay $350 per hour per crew in addition to any line extension fees and makes formal request 10 business days in advance.
- Difference in project cost and credit to be PAID IN FULL by member prior to any construction.
- Cooperative will only attach to services (metering points) having a Cooperative meter base (available at no cost from Cooperative) and meeting Cooperative inspection approval (in addition to any county or state inspections).
- All commercial/large power loads must indicate provisions for power correction equipment. If the provision is stated for correction, account will not be connected until equipment installed.
- The owner/developer will reimburse the Cooperative for the cost of installing and removing any temporary overhead facilities requested by the owner or developer, for the cost of cutting through and replacing pavement within the development, and all costs of punching and, or boring in other areas.
|
|
 |